The terminated contract IT worker in the TPA-5 case also searched for ways to delete logs and cleared several system logs after the attack.
Read the sourceAsk your supplierIf recording stops, does privileged work stop too? Can anyone rewrite the record?
Where it happens
On the access path, this failure sits at the highlighted stage.
Failure and fix
- Fails like this (illustrative, not a reported incident)
- After an incident, the recordings for the night in question are missing: the recorder's storage was full and sessions carried on without it. In another case one administrator can edit both a log and the checksum that protects it.
- Good looks like
- Tamper-evident records under separate control, and no new privileged work without a primary or pre-approved backup evidence path.
Real incidents
This failure has happened. Below are examples on public record, from government advisories, court records and legislative records. They are the ones found so far, not a count of how often it happens. Victims, vendors and products are not named here; the source has the detail.
In OT
SP 800-53 allows a degraded mode when an alternate logging capability exists. Agree that path in advance, so urgent maintenance can continue and be reconciled later. (SP 800-53 AU-5(4))
How the core tests check it
Each test tries the failure on purpose. It passes only if the failure is stopped or detected.
Change a test export and attempt to replace its integrity reference; inspect independent storage/key administration.
One unauthorized actor cannot silently rewrite both authoritative evidence and its integrity proof.
Stop the audit capture path and disconnect the log destination before requesting a new privileged operation.
The fault alerts by D_alert; no new privileged action proceeds without the required durable evidence path.
Mapped to
What this item draws on. The mapping is the author's reading; see BASIS.md.
Controls
- SP 800-53 AU-5(4)
- SP 800-53 AU-9
- SP 800-53 AU-11
- SP 800-53 AU-14
MITRE ATT&CK®
- T1070Indicator Removal
- T0872Indicator Removal on Host
Purple: ICS matrix. Others: Enterprise matrix.
Requirements tested
- P04Protected policy administration
- P12Protected evidence lifecycle
- P13Observable recording failure
- P20Trustworthy degraded operation
Industry practice
S11: inline capture of all traffic, confirmed before connection; records kept.
Further reading
Where to read more on this failure, from the sources this suite cites.